2019-12-18, interior-ceiling-repair-extensive-water-damage-part-2-1-3

This is the final section 2.1 of part 2 of 3 relating to the installation of the truss system and reinforcement of the front cabinet frames and cap.

https://safaritoonces.org/project-tree-branches/repairs/branches-repairs-stains/interior-ceiling-repair-extensive-water-damage-part-2-1-3/

Leave a Reply