This is the second part of the process of repairing and restoration of the ceiling roof truss. This presentation is broken into two parts not based on content, but length of time. This is the first part of this section and is 2.0/3, the last part of this section will be 2.1/3.
This presentation deals with the removal of the main roof truss at the front of the coach. This truss is 3″x4″x 8′ approximately and provides the principle structural integrity for wall and front cap support. The second part of this presentation will show the re-install of the truss and extensive modifications to strengthen the front cap and wall assembly.