The shower area had extensive damage due to water leaks from the skylight. The original plastic domed skylight was replaced with an aluminum framed double construction larger skylight. The shower area referred to has a wardrobe closet, washer dryer, toilette and sink. The change over was done in three phases. First the new skylight was installed, then the interior around the skylight finished in hardwood and finally the ceiling in the entire area was done in 5/16 finished oak, similar to woodwork on a ship.